this is poster for presentation at 24 April 2012.you all can see me at DEWAN GEMILANG...
Wednesday, April 18, 2012
Sunday, April 15, 2012
result and testing
this is my result from simulation using protues software and testing circuit using oscilloscope for testing output at the motor rotation.you can see or compare result from simulation and from testing circuit is same. that way my project is complete .
Friday, April 13, 2012
first record my project.
This video just first stage to propose for my adviser TUAN HAJI ZAINUDIN KORNAIN.
so enjoy this video..
Sunday, April 8, 2012
part 3 **** mechanical ****
Part 3 is the last part mechanical.
for part 3, I completed the installation of solar panels that are connected directly to the volt meter to ensure the maximum of the voltage received by the solar panel. If seen in the prototype above, I use two different size solar panel.
(1) small solar panel,, (output produced by this solar is used directly as input to be used as the source voltage for the operation of this circuit)
(2) large-sized solar panel,, (output produced are connected directly to the voltmeter to measure the voltage value that can produce and it also made an analysis to turn off the solar panels can receive maximum sunlight.
The most difficult part I experienced in the completion of this prototype is the design of LDR. (Light Dependent resistors). in my research, the pyramids in Egypt is the only building known as the "building no shadow" as structure triangle-shaped construction, which is each side of building is bathed in sunlight. so from where Iapplied this concept in this prototype to ensure to the four LDR function effectively.
for part 3, I completed the installation of solar panels that are connected directly to the volt meter to ensure the maximum of the voltage received by the solar panel. If seen in the prototype above, I use two different size solar panel.
(1) small solar panel,, (output produced by this solar is used directly as input to be used as the source voltage for the operation of this circuit)
(2) large-sized solar panel,, (output produced are connected directly to the voltmeter to measure the voltage value that can produce and it also made an analysis to turn off the solar panels can receive maximum sunlight.
The most difficult part I experienced in the completion of this prototype is the design of LDR. (Light Dependent resistors). in my research, the pyramids in Egypt is the only building known as the "building no shadow" as structure triangle-shaped construction, which is each side of building is bathed in sunlight. so from where Iapplied this concept in this prototype to ensure to the four LDR function effectively.
Monday, April 2, 2012
part 2 **mechanical **
Today I have completed Part 2
(mechanical)
Part 2 involves the movement of the motor 2,
which involves the rotation of the motor 360 degrees from
top to bottom.
The fixing must take into
account many factors
1) altitude of the
motor position (allowing rotation of the motor is not
interrupted)
2) use of the
central pillar (center pillar used to support the solar panel bars see
picture above)
Subscribe to:
Posts (Atom)